Which of the following would usually be found on a job cost sheet under a normal cost system?


9) Which of the following would usually be found on a job cost sheet under a normal cost system? Actual direct material cost

Answer


29 The correct option is B Under normal costing, actual direct material cost and applied manufacturing overhead cost are used